
Photo Gallery

The proposed 206 MW Ruzizi III is planned as a run-of-river hydropower project and will be located on the River Ruzizi, which flows from Lake Kivu to Lake Tanganyika.


The proposed 206 MW Ruzizi III is planned as a run-of-river hydropower project and will be located on the River Ruzizi, which flows from Lake Kivu to Lake Tanganyika.